Home
TRIPLE M LLC
Contact Us
Realitors
Downloads
Links
Inspections
Diagrams
Construction
About Us
Articles
LEAD INSPECTIONS
The visual lead test will take approximately 30 minutes and is completed according to the HUD
guidelines.
A complete lead test will vary in time from 1 to 2 hours depending on the size and type of building.
Inspection Summary
Should I test for lead?
•f the home or structure was built prior to 1978 there is the possibility that lead paint was used, testing for lead will verify if lead paint was used or not.

•e recommend keeping the testing reports for future reference and verification
For More Information or to book an inspection call 283-4732
What is a complete lead test?
A complete lead test incorporates the HUD visual lead test and surface sampling of any suspect areas.

It also includes lead swapping of selected wall locations and plumbing line solder connections.

Lab test and verification may be needed if any swabbing is positive for lead.
Quick Links
Mold Inspections Standards of Practice
Commercial Standards of Practice
Mold Inspection Agreement
Radon Pre-Inspection Agreement
Release for Turning on Power or Water
Renovate Right
EPA'a Website on Lead
CDC on Lead
A Parent's Guide to Lead
Get Adobe
Lead Basics
EPA's RRP Requirements