Home
TRIPLE M LLC
Contact Us
Realitors
Downloads
Links
Inspections
Diagrams
Construction
About Us
Articles
Bathroom Remodel
Before Pictures
After Pictures
Complete renovation of bathroom. Complete removal and gut of all fixture, cabinets, plumbing , flooring, door and trim. Replaced bathtub with corner shower, installed double sinks, moved water closet (toilet), installed additional cabinetry to include a pantry unit, Replaced vinyl flooring with sealed laminate, removed paint from old cedar wall T&G and resealed, Provided additional lighting and installed pocket door for more interior room
SCOPE OF WORK
Return to Construction Services